Phase 1:
The first phase of this project at the Angel of the Winds Casino and Hotel located in Arlington, WA. included construction of approximately 268,000 gallon concrete wastewater treatment process basins, site clearing, small diameter process piping, approximately 1,800 cubic yards of associated excavation, backfill and site grading
Phase 2:
The second phase of the project at The Angel of the Winds Casino and Hotel located in Arlington, WA includes construction of a 0.063 MGD Membrane Bio-Reactor (MBR) Wastewater Treatment Facility (WWTF). The WWTF will consist of a headworks facility with fine screening and flow process equipment, UB disinfection, and a laboratory, site and storm improvements, and utilities including raw wastewater influent piping and treated effluent disposal piping. Also included in the project is installation, testing, start up and commissioning of owner supplied Ovivo MBR equipment.