This project consisted of the construction of a new addition to the Chiller Plant Building for the State Health Lab in Shoreline, WA.
Additions and upgrades included two (2) 200-ton chillers, two (2) new cooling towers, control systems, Puroflux filtration systems, and Dolphin chemical-free water treatment system, the installation of circulating pumps and variable frequency drives, along with chilled and condenser water loop process piping systems. Work was completed while maintaining the full operation of the Health Lab.