Removal and replacement of the existing roadway bridge on Fir Street across Olequa Creek, relocation of utilities, temporary installation of utility bridge, and adjustments to the storm water collection and conveyance system. Construction of the bridge including drilled shafts, concrete abutments, soldier pile wing walls, precast concrete girders, concrete deck and concrete barrier; utilities including water line and storm sewer installation, storm water planter construction and planting, and gas conduit installation; road restoration including grinding asphalt, asphalt paving, concrete curbs, and concrete sidewalks.