MCCLURE AND SONS, INC.
P: 425-316-6999 | F: 425-316-6789
Invoices: accounting@mcclureandsons.com

Bids: bids@mcclureandsons.com


Home > Skip Navigation LinksProjects > Water & Wastewater

Back to Project List

Angel of the Winds WWTF

Name: Angel of the Winds WWTF
Location: Arlington, WA
Status: Completed
Type: Waste Water Treatment Plants
Owner: Stillaguamish Tribe
Engineer: RH2 Engineers
Project Amount: $1,650,000

Phase 1:

The first phase of this project at the Angel of the Winds Casino and Hotel located in Arlington, WA. included construction of approximately 268,000 gallon concrete wastewater treatment process basins, site clearing, small diameter process piping, approximately 1,800 cubic yards of associated excavation, backfill and site grading

Phase 2:

The second phase of the project at  The Angel of the Winds Casino and Hotel located in Arlington, WA includes construction of a 0.063 MGD Membrane Bio-Reactor (MBR) Wastewater Treatment Facility (WWTF).  The WWTF will consist of a headworks facility with fine screening and flow process equipment, UB disinfection, and a laboratory, site and storm improvements, and utilities including raw wastewater influent piping and treated effluent disposal piping.  Also included in the project is installation, testing, start up and commissioning of owner supplied Ovivo MBR equipment.

Share this on:
  • Facebook
  • Twitter
  • DZone It!
  • Digg It!
  • StumbleUpon
  • Technorati
  • Del.icio.us
  • NewsVine
  • Reddit
  • Blinklist
  • Add diigo bookmark